Plan driven Procurement - PR transfer from ERP to SRM as SC

former_member974822
Discoverer
0 Kudos

Hello.

I'm using ERP 6.0 EHP4 and SRM 7.0 and i'm implementing the Plan Driven Procurement Scenario.

I believe I've made the necessary customizing, however I cant seem to transfer ERP purchase requisitions to SRM as Shopping carts.

When I run the bbp_extreq_transfer report, in the SMQ1 transction I get the ANORETRY status.

Has anyone had this problem?

Tks.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In addition to the required settings for PDP process, please verify

1. Whether you have created logical system entry (SALE txn in ECC system) with respect to the logical system defined in the "T160PR" table and

2. You have maintained RFC connection for the same in SM59 and ensure password of RFC user is correct.

Regards,

GM

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello,

With ECC6.0 EhP4 & SRM 7.0, we no longer need bbp_extreq_transfer report.

The transfer happens via PI. You have to activate event linkages for BUS2105 Changed, create, sourcing requested (WS 53800009) & implement the BADI ME_REQ_SOURCING_CUST.

Hope this solves.

Thanks

Ashutosh

former_member183819
Active Contributor
0 Kudos

hi

i am not aware srm 7.0 pdp scenario.but some info for you.

refer note :- 1263876- cppr

br

muthu

former_member974822
Discoverer
0 Kudos

Hello

Do you have any information about the customizing needed in PI?

Tks.

former_member974822
Discoverer
0 Kudos

Hello.

I've finally been able to transfer PR from ERP to SRM as SC.

The problem was that the Ship-to adress didn't exist in SRM. The problem was solved by completing the adress information of the organizational structures (PPOMA).

Tkank you all.

Former Member
0 Kudos

Great !!!

I am now facing same issue of error: ANORETRY

Can you send L detail procedure, as u mentioned u have solved the problem. Ichecked I have mentioned Ship to address

regards

mangesh

Former Member
0 Kudos

Mangesh,

Please check SLG1 in SRM . Also check if your RFC user against the ECC entry channel(in Org structure) has got corrupted.

Thanks

Saji George

Former Member
0 Kudos

Hello CLOURENCO

Guess you have gone through the below note,if not..plz will help

Note 1027506 - BBP_EXTREQ_TRANSFER: ANORETRY for PR with different vendors

Arshad