on 07-23-2009 12:07 PM
Hi
i have a problem with BPM Scenario.. which gives me error "Permanent error in BPE inbound processing" in smq2..
and i have seen all the blogs, related posts and SAP NOTES before posting this thread. In WorkFlow Log i'm seeing the
error No valid Object ID in the container Elemetn ABC ( this is receivee step container element). But i'm using the correct
container element and correct interface. then why it is failing.. ?
PLease dont point me to some links as i said that.. i have seen all the related Blogs and SAP Notes for the same
PLease suggest me on the above error...
regards,
Deeps...
Open your Integration Process in IR and press F7 to check if it is configured correctly or not.
Regards,
Prateek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Edit the BPM...make some dummy changes...First Receive Step has Start Process check-box selected.... save....activate....confirm Cache instances are as required (return code, cache status)
Delete the error instance of BPM from SWWL and then again test...if needed reimport the BPM in ID
Some things dont work straight...we need to have workarounds for them
Thanks Prateek and Abhishek for your responses..
I have double checked all the interfaces and incoming messages... but ther are fine preteek..
Abhishek.
i did as you suggested.. done some changes, activated and Cache refreshed... and retun code is 99..
then i have deleted the all error work items in swwl.. after that return became.. 0..
finally Tested again.. still shows same error.....
Regards,
Deeps.
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.