cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection lot generation after every 5th goods receipt

Former Member
0 Kudos

Dear Gurus,

There is a scenario in my project. There are some materials for which the inspection is done on every 5th goods receipt. The inspection of the material will be done for the first time it is coming in the company's premise and for the next four time it will be forwarded directly to the production without any quality inspection. Is it possible in sap to create inspection lot after every 5th inward delivery? Or can anyone suggest me a way to capture this scenario in sap..

Regards,

Abhishek

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

This is possible by using DMR in Task list.

Go to tcode QDR1-->Create a DMR with

follwoing steps;

Dyanmic modification : on Lot level

F5

Stage 10 Inspection seviarity :4 Skip :balnk ist: tick Text:first stage

OK

No of Inspectin:1

Max. skip duration:Blank

New insp. stage:20

NOT OK

Rejections 1

New insp. stage:10

Stage 20 Inspection seviarity :blank Skip :tick ist:blank Text:second stage

No of Inspectin:5

Max. skip duration:Blank

New insp. stage:10

NOT OK

Rejections 1

New insp. stage:10

SAVE

Now use this DMR in task list header at Lot level.

Attach this task list to inspection lot

make sure that you have ticeked on Skip & Auto UD in QM view.

Then in QA16 schecule for Auto UD after every 10 mins or 30 mins.

at plant level also make auto UD & skip 30 mins.

This will skip the 4 lots & UD will be taken in background.

After that it will come to QI

Revert back for More querries.

Regards

Sujit

Former Member
0 Kudos

Hey Sujit,

Thanks for your reply. Can you tell me how to do background scheduling in QA16. Do i have to save the variant and schedule the job in SM36 by using the program name?

Regards,

Abhishek

Former Member
0 Kudos

Hi

If you are using QA10 then create a varient in SM36

But if you are using QA16(create varient ) then scheduling can be done in QA17 only.need not to use Sm36.

Make sure that this scheduling is done for some longer period like 1 hr or 30 mins or more so that it will not affect system performance.

Regards

Sujit

Answers (0)