cancel
Showing results for 
Search instead for 
Did you mean: 

Difference between BBP_GET_STATUS_2 and CLEAN_REQREQ_UP

Former Member
0 Kudos

Hi experts,

Could you point out the difference between BBP_GET_STATUS_2 and CLEAN_REQREQ_UP in SRM? What is its significance both in classic and extended classic scenario?

Thanks,

Madhur

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

CLEAN_REQREQ_UP program deletes the Obsolute table entries ( table BBP_DOCUMENT_TAB) and check whether the doc data tranferd succesfully or not

BBP_GET_STATUS_2 get the back end folloon document status informaiton back to SRM system ex; if any PR,PO,GR

These two manditory jobs need to schedule in SRM system in both classic and extended clasic scenarios

Thanks

prasad.s

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

CLEAN_REQREQ_UP:

It checks whether the backend documents (namely-PR/PO/RES) have been created in the backend systems. Deletes obsolete table entries in SRM as well as updates document numbers in the Shopping Cart. You can't process the SC in SRM until this updae is complete.

BBP_GET_STATUS_2:

It ensures that the information on the back end documents is upto date. Retrieves the updated information from the BE systems (for exaple-it retrieves PO number after it was converted from a PR)

Above reports are mandatory both both Classic and ECS.

Regards,

GM

Former Member
0 Kudos