on 07-23-2009 5:37 AM
Hi experts,
Could you point out the difference between BBP_GET_STATUS_2 and CLEAN_REQREQ_UP in SRM? What is its significance both in classic and extended classic scenario?
Thanks,
Madhur
Hi,
CLEAN_REQREQ_UP program deletes the Obsolute table entries ( table BBP_DOCUMENT_TAB) and check whether the doc data tranferd succesfully or not
BBP_GET_STATUS_2 get the back end folloon document status informaiton back to SRM system ex; if any PR,PO,GR
These two manditory jobs need to schedule in SRM system in both classic and extended clasic scenarios
Thanks
prasad.s
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
CLEAN_REQREQ_UP:
It checks whether the backend documents (namely-PR/PO/RES) have been created in the backend systems. Deletes obsolete table entries in SRM as well as updates document numbers in the Shopping Cart. You can't process the SC in SRM until this updae is complete.
BBP_GET_STATUS_2:
It ensures that the information on the back end documents is upto date. Retrieves the updated information from the BE systems (for exaple-it retrieves PO number after it was converted from a PR)
Above reports are mandatory both both Classic and ECS.
Regards,
GM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please read this link, http://help.sap.com/saphelp_srm30/helpdata/en/24/64474ecfaf11d2b463006094b92d37/content.htm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.