on 07-22-2009 8:16 PM
Hello experts
Inspection plan is not automatically assigned to inspection lot for inspection type Z04(copy of 04).
The lot is created with status CRTD. We are using Material revision level, the material master has two revisions with change number D and E , both are deactivated in CC03.
When I create a new inspection plan with Group counter 2 with exactly same information , the new inspection plan is assigned and the status of the lot is REL.
Not very sure what may be the cause of this problem. Is this due to version/revision. Do we need to apply as OSS note on this.
Many Thanks
Gaurav
Answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Sujit
Understand your point. How shall this issue be fixed in production as there are more than 20000 inspection plans.
Gaurav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
See
You can not change the revision date.....
what you atmost do is change the date of creation of task list.
I know it sounds very sad but really its only one option.Deletion flag to all the material task list for which rev is there & then mass upload plan with new date.
or
In QA01/QA02 desable the revision field in Inspecton specification tab.To be very honest i have not tried this but i think this will help.
Also just a suggetion ...reduce number of task list.club the task lists with similer char..this will help you a lot for mass change.
Regards
Sujit
Hi
It is just because of Validity date of Inspection plan.
And its relation with the revision of the material.
say You have Rev number D and E.........
Lets consider Latest revision is E .Now say it was created on 01.01.2009
Now in QA01/02 you will see a tab of rev in Header as wel as Inspection specification.
This means when revision was created ..Inspection plan must be valid. means Inspection plan must be valid prior to 01.01.2009
So validity date of inspection plan must be prior to revision date creation for material if Rev is exists for material.
Then this will automatically attached.
Also Tick of Auto Assignment must be there in QM view.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Just check the inspection plan date,which should not be greater than the order date.
Regards
Anbu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.