Mat requirement grouping is not happening at Level 1 WBS.

Following setting are maintained

1.Autmomatic Req Grp is set at Proj Def

2. Level 1 WBS is made as grp WBS

3. Periodic lot size is maintained for the Mat as MB

What else is missing?

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

answered

Former Member
0 Kudos

Hi

Have you using the MRP groups ?

if yes

Go to SPRO----Material - Procurement--Activate MRP group for Requirements grouping

Enter the Plant and MRP group and check the Grouping check box.

Thanks