on 07-22-2009 8:37 AM
In inspection plan of a material there are 2 operations.Out of these 2 operations, i want to assign inspection point only for 1 operation.and for 2nd operation i dont want inspection point.but as it is a header level data,i am not able to do it.so how can i do this?
Dear Sandip
There is no standard solution for this. You can try with exit but i dont the possibility of doint without it
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
In Operation overview Under Qaulity MgtInspection point Maintain either of the following for 1 operation
Variant 1: Quantity, Valuation, and Cofirmation (production)
or Variant 1: Quantity, Valuation, and Cofirmation (production)
for 2nd operation ....Inspection point will be there but screen will not be called.
Variant 4: Automatic Valuation Based on Inspection Point Definition
The valuation screen for the inspection point is not called up after the inspection characteristics have been closed.
I hope this will solve your problem
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Then by std method it is very difficult to achieve.This may need some enhancement in QP01/QE11/QF01.
Here you have to make sure that for which operation you don't want Inspection point even if you have maintained in header of QP01.How will you differeciate this operation from other.
May be you can try user exit :QAPP0001
The user exit EXIT_SAPLQAPP_001 is called from module QAPP_IP_CREATE_1.
This module is run through when you go into the create, change and
display transactions for the results recordings. This is independent of
whether the inspection point data screen is called up at a later time.
Regards
Sujit
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.