cancel
Showing results for 
Search instead for 
Did you mean: 

Problem in Delivery with BOM

Former Member
0 Kudos

Dear Experts,

I have problem with delivery with BOM

The steps are:

1. I create Sale Order with BOM A (which consist of material AA 1 PC, AB 1 PC and AC 1 PC) 75 ST

So Sale order shows:

Item Material Qty Unit

10 A 75 ST

20 AA 75 PC

30 AB 75 PC

40 AC 75 PC

2. I create Delivery reference sale order from 1 so Delivery will be:

Item Material Qty Unit

10 A 75 ST

20 AA 75 PC

30 AB 75 PC

40 AC 75 PC

But I want to delivery only 25 ST so I change quantity in Item 10 from 75 to 25 but the system show:

Item Material Qty Unit

10 A 25 ST

20 AA 25 PC

30 AB 25.004 PC

40 AC 25 PC

What happen with Item 30 why system determine to 25.004. Please help me

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Please check

1. The unit conversion between ST and PC

2. The rounding profile of item 30 in MM02 (Sales View)

Ken

Former Member
0 Kudos

Hi,

if you want change the item quanty like TAP or TAN plz goto VOV7 select TAP Item category under bill of material/configuration Maintainstructure scope A and application SD01 put the check mark for *manual alternativs and same to TAN also

.

Your Itemcategory determination should be IN VOV4

QT-LUMF--TAP

QT-NORM-TAP-AGN

If your using BOM item categories is showing gray mode only.

regards,

sreenivas

Former Member
0 Kudos

Dear sir,

Thank you for your reply but I want to know why system determine to 25.004 PC instead of 25 PC

Former Member
0 Kudos

Kindly check in CS02 with main Item as "A" to check the Quantity of "AB".

Also Check the stock of material "AB" in MMBE.

Best Regards,

Ankur