SRM Error message Workcenter data incomplete

Former Member
0 Kudos

Client is having problems creating PO's in SRM. The client is getting an error message Workcenter data incomplete. Enter data in all required fields. I have ran the consistency check and it look OK.

When I move them from one org to another the error goes away. Both Org structures are at the same level, but in the one structure all the persons have the same error. Address for person (BP) 0000001232 contains errors: e-mail address missing when I run the Branch for sysnchronization for repair for this unit.

Accepted Solutions (1)

Accepted Solutions (1)

former_member183819
Active Contributor
0 Kudos

hI

Hope you might run HRALXSYNC report or BBP_BP_OM_INTEGRATE TRANSACTION

Go to the error Organisation and go to address tab at the bottom you may find one email button. check what is the entry of email address

br

muthu

Answers (1)

Answers (1)

Former Member
0 Kudos

muthu, we do run the HRALXSYNC because we do not have that mod. I was able to resolve the issue by moving all the bp from that level and then I recreated that level and move them all back into the new level. Then i was able to run the org check and all the BP were in the green.