cancel
Showing results for 
Search instead for 
Did you mean: 

Two inspection lots origin 01

Former Member
0 Kudos

Hello everybody

I would like to create two inspection lots during the goods receipt. Each lot has an own usage. How can I do this?

Best regards

Yavuz

Edited by: YCIYAN on Jul 20, 2009 9:05 PM

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

I know on esuch a exaple of 01 inspection lot origin

01 Goods Receipt Insp. for Purchase Order

&

0130 Receiving Insp. from External Processing

you can make settings to inspect goods receipts from an external process, or subcontract (external process with material to be provided).

When a goods receipt is created from an external process, the system creates an inspection lot for the production order, as long as an inspection type is entered in the external operation for inspection lot origin 01. If there are several externally processed operations in a task list or order, the inspection lots can be identified by their inspection types. By specifying a task list usage in the inspection type, you can cause the system to select different inspection plans for different external processes.

As per my knowledge this the only one example.

but as Inspection origin is asigned against mv type where you can only spefify one origin.

I am not very sure how it can be done.

Regards

Sujit