How to update BOM with diff. ECN

Former Member
0 Kudos

Hi Team

During change in BOM using ECM, I am allowed to change it with same ECN. If we change it with diff. ECN, it keeps the history of previous ECN.

Foe example a BOM has 3 diff. items, which is created with ECN: 001.

Now if we delete 2 items & add 1 item, then system displays all the items with respective change no.

i.e. Total 6 line items are displayed.

Pls suggest solution.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Bhushan,

For your case you need to :

Create a different Change Number through T Code: CC01 and create a new BOM (for the same material as it exists without ECN agaist any components) with this new change number. If you now delete / add some components (after you enter the BOM with this new ECN) ;it will be exclusively be recorded with this ECN.

If you use the same ECN; and do further changes at the components; all chages till date will be recorded as you have mentioned.

Thanks,

Ravi.