on 07-17-2009 9:25 PM
I have posted this within a previous thread but I started a new thread to get fresh view on this from our sdn basis contributors
We are trying to setup a DR system with SAN replication.
PRD = production SID
The datafiles and log files of sap system PRD (on host1) are on SAN. The infrastructure team has set up SAN replication between primary site SAN and secondary.site SAN In the case of a DR situation, infrastructure team will attach the secondary site SAN LUNS to the DR system (host2) which already has SAP installed. Below are they steps that were done
These are steps covered till now
1) A system refresh of system PRD (host 1) to PRD on (host2) using backup/restore of the PRD database has been performed and then we ran the migration tool of SAPINST (on host 2)
2) DB team has setup SAN replication to secondary SAN at DR site. They are managing it with a SAN replication software.
3) They plan to test the DR by doing the following
a) Pause replication between the 2 SANs
b) Attach the secondary SAN to host 2
c) Map the driver letters for datafiles to be the same as entered during installation of SAP on host2 via SAPinst
4) Start SAP
Will this work ? Will the master db, msdb, model and tempdb of MSSQL server also need to be restored Any ideas on this
Thanks, Vikram
No double posting.
Close the open thread before opening a new one with the same info.
Read the "Rules of Enagagement"
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
10 | |
9 | |
8 | |
6 | |
6 | |
6 | |
5 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.