on 07-17-2009 12:09 PM
WE need to create two separate material PR document type for example WBS level-1 and WBS level-2. How can I achieve it.Any user exit or what is the simplest method.
Zinni
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Zinni,
Can you please elaborate more...why and in which situation you need to have multiple PR document types in same project ?
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Thanx. My project having two separate WBS element for which import trading material is required and some material required during installation , mostly consumable materials. Two separate document type is required for the purpose.
Please give me logic how can I assign two document type for two separate WBS element.
Zinni
Hi,
Use THE EXIST: COZF0002, for changing the purchase doc for PS.
Rgds
Sudhir Reddy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.