We have a requirement that is to upgrade an Enterprise (i.e. R/3 4.7) to ECC6.0 (ABAP+JAVA).
My plan is to upgrade 4.7 to ECC6.0 ABAP, then install the Java stack as an add-on.
Because I do not have the SMP ID at this moment(roll off), I cannot verify.
Would you please confirm my plan?
Thanks!
Hi ,
Please go ahead to upgrade the ABAP 4.7 and then when it is on Ecc6 install the Java Instance on it.
Thanks
Rishi Abrol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
My plan is to upgrade 4.7 to ECC6.0 ABAP, then install the Java stack as an add-on.
I would suggest you to go with sync ABAP+JAVA upgrade
Because I do not have the SMP ID at this moment(roll off), I cannot verify
Once you get your S id just follow the guide which clearly mention the step by step procedure
Regards
Uday
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I will recommend to go through upgrade Master guide for ECC 6.0. This has all scenarios and recommended way to do it.
Thanks,
Digesh Joshi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.