on 07-14-2009 1:30 PM
Hello SDN,
I have general question.
I have Java- Singl stack NW 7.0 connected to ERP 6.00 ABAP Stack only NW 7.00.
Is it possible to upgrade the JAVA Stack to EHP1 but the ABAP - Stack stil be without EHP's ?
Best regards
Vladimir
HI
Note 1156186 - Add. info.: Upgrade to SAP NetWeaver 7.0 including EHP1 Java
Regards
Uday
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vladimir,
If system is ABAP+JAVA then you should upgrade both. But if system is AS JAVA then it should not be a problem.
But better if you will upgrade all to avoid any problems.
Thanks
Sunny
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It shouldn't be a problem as you have separate stacks but still check the prerequisites in install guide[http://service.sap.com/instguides]
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Is it possible to upgrade the JAVA Stack to EHP1 but the ABAP - Stack stil be without EHP's ?
Yes you cando that but not sure how the consequences will be later
Regards
Uday
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.