NW JAVA EHP1 compartibility with ERP6.00

vladimir_golovtchiner
Participant
0 Kudos

Hello SDN,

I have general question.

I have Java- Singl stack NW 7.0 connected to ERP 6.00 ABAP Stack only NW 7.00.

Is it possible to upgrade the JAVA Stack to EHP1 but the ABAP - Stack stil be without EHP's ?

Best regards

Vladimir

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

HI

Note 1156186 - Add. info.: Upgrade to SAP NetWeaver 7.0 including EHP1 Java

Regards

Uday

Answers (3)

Answers (3)

sunny_pahuja2
Active Contributor
0 Kudos

Hi Vladimir,

If system is ABAP+JAVA then you should upgrade both. But if system is AS JAVA then it should not be a problem.

But better if you will upgrade all to avoid any problems.

Thanks

Sunny

vladimir_golovtchiner
Participant
0 Kudos

Hello Sunny,

thanks for encriesing my hopes

do you know referncies to some documents?

many thanks in advance

Vladimir

Former Member
0 Kudos

It shouldn't be a problem as you have separate stacks but still check the prerequisites in install guide[http://service.sap.com/instguides]

Former Member
0 Kudos
Is it possible to upgrade the JAVA Stack to EHP1 but the ABAP - Stack stil be without EHP's ?

Yes you cando that but not sure how the consequences will be later

Regards

Uday