on 07-14-2009 6:32 AM
Hi,
Presently when I am doing GR for a material system generates a inspection lot per GR.But when I am doing GR for same material several times per day system should generate inspect lot once only.or if material belongs to same supplier also it should generate one lot for that day .how to do with dynamic modification rule?
manoj
Dear Manoj
In DMR (QDR2) maintain reset period level as 1. What this will do is soon after 1 day system will bring it to the initial stage.
When an inspection lot is created, the system checks if the reset date for the quality level has been reached or exceeded at each sample calculation. In such a case, it resets the qualiy level to the initial stage of the dynamic modification rule and uses this initial stage for the current inspection lot.
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dear Madhav
Check in QDL2 what is the inspection stage. I mean current and next inspection stage. you will get the current in the dynamic rule history
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear madhav
Sorry I have read the wrong thread. Sujit has recommended the right one . Let me test and come back to u with the current setting
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
That means you are in skip stage.
that is a reason system is not allowing you to do RR.(check char status must be:SKIP)
also go to QA02-->isample->In blue color you will get message of "Lot is not inspected (skip lot) "
That means you have already created one lot which was not skip(initail lot) or you have made initial/start to skip stage in QDR1.
Please attach it to differnt material in testing server & check.
I have tried cycle it's working fine.
You can try with QA01-manual lot creation.
Regards
Sujit
Dear Manoj
If you have done according to Sujit then one change in the first stage
First Stage
Inspection severity 004 (normal)
Ist stage tick
No of inspection 1
New inspection stage 99
Rejection 1
New inspection stage 1
if you skip both the stage then you will not be able to do the result recording even once
Make sure that you create a sampling scheme with inspection severity 004
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
manoj
Is your requirement is to Inspect only one lot from one supplier oryou want to cumulate all lots to one.
I think first one is possible through DMR:In task list assgin DMR & in Material assignment of task list header assign vendor.
but if you want to cumulate all lots to one this is not possible.
There is one provision in QM view > inspection setup>inspection type.X : for each purchase order item,batch & storage Location.
This will create one lot for one PO.
Revert back
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
1. if same material per day-one lot
Create a DMR with Reset period 1 day.
Two stage DMR with First stage : Inspection 1
Second stage: 99 skip reset 1 day.
Now apply this DMR in task list Header.
Go to QA16 and set auto UD after Every 30 mins for 01 inspection type.
Also QCC0->Basic setting>plant level>Insp lot completion>Auto UD-->
maintain 30 mins here for skip & auto ud
this will create first lot every day & will come to inspection.
from second lot all lots will come to QI but stock posting will be done by system.
2.if same vendor material -one lot
in QP01>material Assignment>enter vendor material combination here.
rest of the things will remain same.
Regards
Sujit
Hi Sujit,
now problem is when I created first lot it is showing skip & material is directly going in unrestricted.I created DMR with following settings
1.dynamic modification-for ud
2. validaty of quality level
3.usage indicator-used in task list
stage.1
tick in skip, tick in 1st
no of inspection--1
max skip dur---30
new stage--99
rejection-1
new inspection stage--1
stage 99
tick in skip only
no of inspection-1
max skip dur-30
new stage-1
rej-1
new inspection stage-1
regards,
manoj
Hi
chage the following
stage.1
tick in skip, tick in 1st (Remove tick of skip & tick on Start of cycle ,seviarity :4) no of inspection--1
max skip dur---30 ( remove this)
new stage--99
rejection-1
new inspection stage--1
99
tick in skip only (keep tick on skip)
no of inspection-1 (make it 99)
max skip dur-30 ( remove this)
new stage-1
rej-1
new inspection stage-1
this will work
Regards'
Sujit
Hi Sujit,
I did all settings as u directed.Now when today I created new lot, in RR everything is in grey (disable).not able to do RR .& material automatically comming to unrest area.
My requirement is for first lot I should do RR & UD .& rest of the lots for the day no RR & UD directly it should go to unrest for same material & vendor
. Regards,
Manoj
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.