cancel
Showing results for 
Search instead for 
Did you mean: 

one inspection lot for all GR per day.

Former Member
0 Kudos

Hi,

Presently when I am doing GR for a material system generates a inspection lot per GR.But when I am doing GR for same material several times per day system should generate inspect lot once only.or if material belongs to same supplier also it should generate one lot for that day .how to do with dynamic modification rule?

manoj

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Manoj

In DMR (QDR2) maintain reset period level as 1. What this will do is soon after 1 day system will bring it to the initial stage.

When an inspection lot is created, the system checks if the reset date for the quality level has been reached or exceeded at each sample calculation. In such a case, it resets the qualiy level to the initial stage of the dynamic modification rule and uses this initial stage for the current inspection lot.

Regards

gajesh

Former Member
0 Kudos

Hi Gajesh ,

Reset period is already 1.

regards

manoj

Answers (4)

Answers (4)

former_member186399
Active Contributor
0 Kudos

dear Madhav

Check in QDL2 what is the inspection stage. I mean current and next inspection stage. you will get the current in the dynamic rule history

Regards

gajesh

former_member186399
Active Contributor
0 Kudos

Dear madhav

Sorry I have read the wrong thread. Sujit has recommended the right one . Let me test and come back to u with the current setting

Regards

Gajesh

Former Member
0 Kudos

Hi Gajesh,

QDL2 status

in tightned tab

next stage is -1

&Dynamic modification history tab

current stage is -99

& let me clear one thing I don't have sampling scheme.

Former Member
0 Kudos

Hi

That means you are in skip stage.

that is a reason system is not allowing you to do RR.(check char status must be:SKIP)

also go to QA02-->isample->In blue color you will get message of "Lot is not inspected (skip lot) "

That means you have already created one lot which was not skip(initail lot) or you have made initial/start to skip stage in QDR1.

Please attach it to differnt material in testing server & check.

I have tried cycle it's working fine.

You can try with QA01-manual lot creation.

Regards

Sujit

former_member186399
Active Contributor
0 Kudos

Dear Manoj

If you have done according to Sujit then one change in the first stage

First Stage

Inspection severity 004 (normal)

Ist stage tick

No of inspection 1

New inspection stage 99

Rejection 1

New inspection stage 1

if you skip both the stage then you will not be able to do the result recording even once

Make sure that you create a sampling scheme with inspection severity 004

Regards

gajesh

Former Member
0 Kudos

Hi

manoj

Is your requirement is to Inspect only one lot from one supplier oryou want to cumulate all lots to one.

I think first one is possible through DMR:In task list assgin DMR & in Material assignment of task list header assign vendor.

but if you want to cumulate all lots to one this is not possible.

There is one provision in QM view > inspection setup>inspection type.X : for each purchase order item,batch & storage Location.

This will create one lot for one PO.

Revert back

Sujit

Former Member
0 Kudos

Hi sujit,

See client needs system should generate single lot if i will do more than one GRN with same material.then what will be the settings in DMR?

there should options.

1. if same material per day-one lot

2.if same vendor material -one lot

Former Member
0 Kudos

hi

1. if same material per day-one lot

Create a DMR with Reset period 1 day.

Two stage DMR with First stage : Inspection 1

Second stage: 99 skip reset 1 day.

Now apply this DMR in task list Header.

Go to QA16 and set auto UD after Every 30 mins for 01 inspection type.

Also QCC0->Basic setting>plant level>Insp lot completion>Auto UD-->

maintain 30 mins here for skip & auto ud

this will create first lot every day & will come to inspection.

from second lot all lots will come to QI but stock posting will be done by system.

2.if same vendor material -one lot

in QP01>material Assignment>enter vendor material combination here.

rest of the things will remain same.

Regards

Sujit

Former Member
0 Kudos

hi,

I did all settings as u told but still system is generating inspection lot for same vendor.system should generate only one lot per day for same vendor & material for first GRN only.

Former Member
0 Kudos

Hi manoj

See lot will be created for that Vendor _ material combination.Say 10 times material came in a day.

Now all 10 lots will be created.but except first rest of 9 will be in SKIP status.

these skip will be automatically removed by system after each 30mins.

Regards

Sujit

Former Member
0 Kudos

Hi Sujit,

thanks now I am nearly came to conclusion.....my plant level settings are

inspection lot completion tab .

delay time for skip lot 1560

1.waiting time hours --25

2 waiting time min --60

is it ok?

Former Member
0 Kudos

Hi

No

maintain following setting

inspection lot completion tab .

delay time for skip lot 30 min

1.waiting time hours -- blank

2 waiting time min --30

Regards

sujit

Former Member
0 Kudos

Hi Sujit,

now problem is when I created first lot it is showing skip & material is directly going in unrestricted.I created DMR with following settings

1.dynamic modification-for ud

2. validaty of quality level

3.usage indicator-used in task list

stage.1

tick in skip, tick in 1st

no of inspection--1

max skip dur---30

new stage--99

rejection-1

new inspection stage--1

stage 99

tick in skip only

no of inspection-1

max skip dur-30

new stage-1

rej-1

new inspection stage-1

regards,

manoj

Former Member
0 Kudos

Hi

chage the following

stage.1

tick in skip, tick in 1st (Remove tick of skip & tick on Start of cycle ,seviarity :4) no of inspection--1

max skip dur---30 ( remove this)

new stage--99

rejection-1

new inspection stage--1

99

tick in skip only (keep tick on skip)

no of inspection-1 (make it 99)

max skip dur-30 ( remove this)

new stage-1

rej-1

new inspection stage-1

this will work

Regards'

Sujit

Former Member
0 Kudos

Hi Sujit,

I did all settings as u directed.Now when today I created new lot, in RR everything is in grey (disable).not able to do RR .& material automatically comming to unrest area.

My requirement is for first lot I should do RR & UD .& rest of the lots for the day no RR & UD directly it should go to unrest for same material & vendor

. Regards,

Manoj

Former Member
0 Kudos

Hi Sujit,

I created demo as u said now in Qa02 it is showing lot not inspected skip lot.is there any relevance of sampling scheme? I not created it .now where is the problem?

Regards,

Manoj

Former Member
0 Kudos

Hi

No this is not because of Smapling scheme.

100% problem is in QDR1(DMR)...please check it again.

your first lot must come under inspection every day.

or else send me the screenshots.

Regards'

Sujit