on 07-13-2009 7:05 PM
Hi Gurus,
I have this situation:
Product Chain: A - B - C -D
Location Chain: X - Y
Example:
Original Order 10 ea for Product A, in Location X.
No one products have stock.
Location - Product
X - A
X - B
X - C
X - D
Location - Product
Y - A
Y - B
Y - C
Y - D
It is possible to set the Remaing Requirement in the entry product, but in the last location?
(10 ea for Product A to Location Y)
Regards
You can either set it at the first or last location/product combination as per the standard configuration. Try using Rule control to get to begin or end at the A-Y combination that way standard configuration can be used.
Let me know if it works.
Regards,
Harish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Tkanks for your tips.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Harish,
Thanks for your reply.
Where in Rule control (/n/sapapo/rba04) could I to make it? "In Access Strategy of subst. list?"
Before, I've configured in Check Instructions, Remaining Requirements Type 3.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Adrian,
Check Instructions setting is mandatory. I think 3 is for Remaining Requirement at Last subsititution. Rule control is in RB04 that is assigned to the rule you created to trigger your process.
How you setup the rule control would depend on your process following links might help you set it up.
http://help.sap.com/saphelp_scm50/helpdata/en/26/c2d63b18bc7e7fe10000000a114084/frameset.htm
http://help.sap.com/saphelp_scm50/helpdata/en/26/c2d63b18bc7e7fe10000000a114084/frameset.htm
Regards,
Harish
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.