cancel
Showing results for 
Search instead for 
Did you mean: 

Reverse a Return Delivery with inspection lot posted (QM)

Former Member
0 Kudos

Hello experts,

I want to reverse with transaction VL09 a good movement of a return client delivery with inspection lot. I posted the inspection lot and transferred the material to Unrestricted use (transaction QA11).

Then I began the cancel Return Process and I transferred the material to Quality (movement type 322) to run VL09 with material in Quality stock, but the system displays the following error message:

You cannot cancel GR, since inspection lot is already partly posted

Message no. QA046

Diagnosis

You are attempting to reverse a goods receipt although quantity postings have already been made from the inspection lot. This means that stock for the goods receipt has already been transferred and, for this reason, a cancelation of the document is no longer possible.

Procedure

Ensure that the postings in QM (within the usage decision transactions) are carried out.

Please let me know what can I do to reverse the return delivery.

Thanks in advance.

Pablo

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
Active Contributor
0 Kudos

Check this thread

[Re: GR Reversal \ QM Problem |]

thanks

G. Lakshmipathi

Former Member
0 Kudos

Hello,

With the lot inspection posted I have the material in Unrestricted Use but now I need to reverse the return delivery (post a good issue). I can not do that in transaction VL09 because the lot ispection is posted so how can I do this to post a good issue?

Thanks in advance.

Pablo