Hi sap gurus,
I have created master recipe and given inspection point, sample drawing procedure, inspection characteristics with QM04 Control key. In material master i have given 03 inspection type. In SPRO i have assigned master recipe for 03 inspection tyoe. After process order creation lot is not generating. Kindly give your suggestion where i am doing wrong?
Regards,
Krishna
1) Plz. check whether 03 inspection type is activated in material master.
2) Release production order and then check
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hii
go to QCC0>Quality Inspection->inspection lot creation>Inspec for Mgf order>Maintain Parameters for Process Order Type->select plant,order type>go tp planning->Quality inspection->03 inspec type.
Your problem will solve.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Friend,
Please check the status of the Process Order.Check whether it is released or not.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
14 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.