on 07-08-2009 1:23 PM
Dear QM Experts,
Scenario is,
1. Material master created with QM view activation.
2. The Base Unit of Measure kept as EA
3. Inspection plan prepared for material with usage 5 and status 4.
4. Material has not undergone any purchase order / production order / routing or any other transactions except inspection plan.
5. No movements have done and the stock is zero
6. The requirement is to change Base Unit of Measure from EA to KG
When tried through MM02 system throws an error message as The base unit of measure cannot be changed; choose "Display errors" Message no. M3189
When viewed through log another information gets displayed as Routings already exist that are assigned to the material. Task list type Q.
I tried through trial and error method. First material assignment was deleted from task list, problem did not resolve. Thereafter deletion flag put to task list. No impact. At last entire task list deleted. Still system does not allow changing unit.
Has anybody faced the same problem ever? Whether deletion of task list (By T-Code QSR6) from data base will server the purpose? What are the obligations that one must follow while execution QSR6?
Or if there is any other solution to this requirement?
Thanks in advance
Best Regards,
Anand Rao
Hi
*What are the obligations that one must follow while execution QSR6?*
By this T code Deletion is very much possible provided that
If there are no stocks of the material in the current period and in the previous period
If there are stocks in the previous period, you can clear them as follows:
a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
If no purchase requisitions, purchase orders, or scheduling agreements exist for the material
&
Material Is used in any task list/Rauting.
Now as per your schenario I hope you have checked Inspection lot & PR,PO.
Error showing Q type of task list.
Go to PLKO & MAPL table for this material & group & Gr counter check the entry.
Check deletion Indicator in both the tables. If it has status "X" then this task list is very much possible to delete through QSR6.
I hope this will add some value to your Execuation.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sujit,
Thank you for your prompt reply.
I checked in MAPL table. It is very well showing X there. That means task list is getting treated as deleted. Still the system does not allow changing the base unit of measure.
There is no stock of the material neither in current period nor in earlier period. The material is freshly created and none of the movements have happened yet.
No inspection lot has generated yet. I mean transactions happened uphill now on the material are as follows,
1. MM01 Basic, MRP, QM, Accounting, plant data 2
2. QP01 Inspection plan preparation
Any guesses?
Best Regards,
Anand Rao
The problem gets resolved after performing QSR6 transaction.This removes the entry from MAPL table, and MM02 can be done for unit change.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
9 | |
8 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.