on 07-07-2009 6:13 AM
Hi,
I completed the results recording and while saving i get msg that the required characteristics are still open. I saw the status is still 2 but not 5 .....how do i set the status 5 automatically when a characteristics recording is completed?
Thanks
Hi
sravan
completed the results recording and while saving i get msg that the required characteristics are still open. I saw the status is still 2 but not 5 .....how do i set the status 5 automatically when a characteristics recording is completed?
As you said You have only completed the Result recording.
but you have to change the status 2 to 3 --> by valuating the char
& then 3 to 5 -->by closing the char( lock symbol)
after it reaches to 5 then only you will not get messge "required characteristics still open"
for auto closing
please goto SPRO>QM> Basic Settting >setting at Plant Level > Plant> Result Recording > Recording Configuration > Automatic Close.
What happens with this setting is that , After confirming the results for a characteristic, you choose enter. The characteristic is automatically closed.The system automatically calls up the next characteristic.After confirming the last characteristic, the system automatically navigates to the next operation .
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.