Hi All,
I tried changing one material by it reflects an existing Delivery for the said material, I checked the DR and found that it was already received - although its Shipment Cost hasn't been transferred. What should be done with these DRs?
😃
To change a materials type you will have to make sure that all documents are complete and ther is no stock of the item.
As long as there are open documents you cannot change the materials type.