Cannot change Material Type due to existing DR

Former Member
0 Kudos

Hi All,

I tried changing one material by it reflects an existing Delivery for the said material, I checked the DR and found that it was already received - although its Shipment Cost hasn't been transferred. What should be done with these DRs?

😃

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

To change a materials type you will have to make sure that all documents are complete and ther is no stock of the item.

As long as there are open documents you cannot change the materials type.