Hi ,
Is there any way one can link a PR to a Reservation both created manually.
Regards
Nandini
Hi,
I think its option not available,
Resrvation based onmaterial consumption point of view , the resavarvation for whom ( cost centre ,,,) to consume.
Regards,
Andra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
It means you want to see the report on materail basis and in output u r expecting all the reservations and PR created for this materail.
You can link table EBAN and RESB
Please check
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
When you are creating Reservation using MB21 AND then PR is using ME51N.
Please let us know why u want to link...is there any thing which u r entering common in both..?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can check in EBAN table.
This table will give you both the fields Reservation and PR.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Not understandable, be Clear.
PR can be created manually by ME51N
Reservation can be created by MB21
If your query mean to say that is it possible to Create the Reservation by PR or Reservation creation from PR.
It is possible to link the Reservation to PR in PM & PS Modules
rgds
gsc
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I already created a reservation (for 100 bags of cement and reservation number is 1121) from project systems. I chose the material (100 bags of cement) and selected item category L (stock). Since this material is stock, hence a reservation number is generated NOT Purchase requisition.
How do you link then the reservation number to the Purchase Requisition? I am trying to create Purchase Requisition in ME51N with reference to the Reservation Number (which was created in PS) but i don't see any field where i can input the Reservation Number Created.
I already created a reservation (for 100 bags of cement and reservation number is 1121) from project systems. I chose the material (100 bags of cement) and selected item category L (stock). Since this material is stock, hence a reservation number is generated NOT Purchase requisition.
How do you link then the reservation number to the Purchase Requisition? I am trying to create Purchase Requisition in ME51N with reference to the Reservation Number (which was created in PS) but i don't see any field where i can input the Reservation Number Created.
Thanks in advance.
Hi,
If you are creating PR with reference to maintanace order, you can find the link between PR and Reservation.Because system will create reservation number for all the PR created wrt Maintenence order.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.