on 06-26-2009 9:37 AM
Hi
Can you please explain me whether we can create our own put away strategy based on the MRP(Maximum Retail Price) of a material.?
it means same material having different MRP should not get merged into a single bin.
I cannot use it at batch level because my batch characters are on monthly basis.E.X. 200812,200901,200902.
it always happens that different batches will quite often have same MRP.So if i use at batch level then i loose lot of space in my WH because it keeps booking the fresh GR into to next empty bin
but i dont want to store them into separate bins as i loose space in my WH.
Instead i want to store the materials having same MRP (belonging to either same batch or different batch) in a same bin and different MRP into different bins irrespective of batches.!!
can i develop a put away strategy satisfying this requirement.??
thanks in advance for your response on this.
regards
Venkat
Hi,
MWMTO003 Own stock removal strategy, here you can select the bin as per your requirement.
MWMTO007 Here you can control the search strategy for putaway.
Thanks
Funko Technical.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.