Costing item X is not assigned to a cost component

Former Member
0 Kudos

Hi,

I'm using CK11N for releasing standard cost and I got this warning message.

"Costing item 00007 is not assigned to a cost component", how can I fix this problem?

Thanks in advance!

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi. I'm getting a similar error message (CK239 Cost element 52XXXX is not assigned to a cost component).

I looked at the OKTZ table and of course the cost element isn't there, but we don't want it to be there. What is happening during the CK11N process that is calling attention to a cost element that doesn't exist in our OKTZ table?

I have reviewed the material master data, the BOM and the routing and don't see any set up items that are out of the ordinary.

Any help on this would be greatly appreciated.

Thanks

Josh

Former Member
0 Kudos

HI Josh

I am getting the same error.....How did you manage to solve the problem?

Thanks a lot!!!

Javier

Lakshmipathi
Active Contributor
0 Kudos

Also check in OKTZ.

thanks

G. Lakshmipathi

Lakshmipathi
Active Contributor
0 Kudos

Maintain the required values in OKKN

thanks

G. Lakshmipathi