Material cost estimate with quantity structure (tcode: CK11N)

Former Member
0 Kudos

Hey dear friends.

I donu2019t know in which forum I should put my question above.

In fact, Iu2019m new to SAP PM module.

Iu2019m trying to create material cost estimate with quantity structure (tcode: CK11N) for a material u201CXu201D.

This material is manufactured.

While running the transaction CK11N, I got an error message.

After analyzing this error message, Iu2019ve realised that somebody had assigned wrong activity types to cost centers which are linked to this material in tcode: CR03, tab: costing.

So Iu2019ve changed and assigned the right activity types.

Then, Iu2019ve tried to run the tcode CK11N again. But the system still brings the wrong activity types and seems to ignore the ones that Iu2019ve assignedu2026

It seems like the old activity types still linked to the cost centers somewhere else than in tcode CR03u2026

Any idea about what am I mising ?

Thank's in advance.

Bahia.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

A FI consultant resolved that.

Thank you for your kind support.

Bahia.

Former Member
0 Kudos

Hi

Basically the link between costcenter and the activity type is maintain in KP26 transaction code , this T.code belongs to FI/CO module. So ask your CO consultant to assign the new activity type to the particular cost center.

Otherwise if you access for the T code KP26

Enter Version = 0

From period = enter from which period you want to enter for example 5

To period = for example 7

Enter the cost center

and enter the activity type

press enter

in the table you enter the fixed price of the activity and save.

Please try and come back

Thanks

S.Murali

Former Member
0 Kudos

Dear Murali

I checked the asignement in KP27.

Everything's ok with it: the new activities are assigned to the cost center according to what's in CR03.

So appearently the problem is not coming from that.

Any other suggestions please ?

regards,

Bahia.

Former Member
0 Kudos

Hi Bahia

Check in your routing , whether the new activity types which you changed is reflected or not.

Thanks

S.Murali

Former Member
0 Kudos

What do you mean by "routing" Murali, please ?

Bahia

Former Member
0 Kudos

Hi

Routing will define the sequence of operation for production. Routing contains the Workcenter and activity types. The same routing is called as task list in plant maintenance.

Thanks

S.Murali