on 06-05-2009 8:58 AM
Hi experts,
What is the settings required behind sales order for the Assemble-to-order and make-to-order
Thanksin advance,
Anthyodaya.
Edited by: anthyodaya Reddy Nagaram on Jun 5, 2009 10:36 AM
ok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello
There are no seetings per se for the above requriements in sales order configuration. the production strtergy is linked to sales order through requriemtn types
the requiremtns type is determioned through MRP / group / stratergy group /schedule line assignemtn etc as per sap standard rules
the mrp group / startergy group is entered in material master
you can go to the below t codes for configuration nodes
OVZH
OVZG
OVZI
OVZ8
Hope this helps
Thanks
akasha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi reddy,
settings is not needed for the sales order,settings should be maintained for the material master record(material type),and also for the item categoies and the schedule line categories.
thanks
senya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|