on 04-20-2006 9:49 AM
Hi guys,
I am configuring END to END monitoring in RWB with hel of how to guide. I have created PMI_MONITORING in SXMB_ADM. But i am not able to see all the business systems in my configuration tab page.
Is it required to create the ports using IDX1 in corresponding business systems to connect to integration server?
Regards,
Keith
Hi,
Some links for configuration-
http://help.sap.com/saphelp_nw04/helpdata/en/82/9e8dfe9eadbd4b9194c433e646b84e/frameset.htm
Thanks,
Prateek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi pratik,
Thanks for u r reply but error i am getting is
No ports that send to the Integration Server could be found for the following ALE logical systems:<br>DSMCLNT200: Unable to log on to system DSM in language en with user XIRWBUSER <br>DR3CLNT200: Unable to log on to system DR3 in language en with user XIRWBUSER <br>DCMCLNT200: Neither the messager server nor the application server can be reached for system DCM <br>
Regards,
Keith.
User | Count |
---|---|
85 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.