Dear Experts,

Can we create project from sales Order ?

If yes what are the settings or configurations required.

Please post your valuable inputs.

Regards

Etr

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Answers (7)

Answers (7)

Former Member
0 Kudos

closed

Former Member
0 Kudos

Hi

As per your scenario line item 3, 4 has a BOM... say a FERT item which will be delieverd and subsequently billed.

Do the following step:

1. Create a FERT item... say a item in the sales order...

2. Put it into the sales order line item... and generate the sales order say 1-10252... in VA01

3. Create a project having coding mask as 0-00000-000, etc say and make ur project as 1-10252 in CJ20N

4. Put the FERT material in WBS and run the MRP

5. Do the production and then delivered it through project

6. Billed it in the sales

Regards

Uddhab

Former Member
0 Kudos

Amit, Sandeep and Anish your given very help ful links thanks,

and one more doubt i want Project number with Sales Order Number and Profitablity Analysis is each Line Item wise. How we can do this?

Regards

Etr

anishpv
Participant
0 Kudos

Hi,

Std .sap functionality gives you sales order num. as the project definition.

For PA for each line item one must define in assignments of cost elements for RA

if i am not wrong.

regards

Anish

anishpv
Participant
0 Kudos

Hi,

pls ref the link

[;

regards

anish

stheurkar
Active Contributor
0 Kudos

Hi,

It is possible to create project from sales order.

Before you can use assembly processing in the Project System, you must have made the necessary settings as described in Settings for Assembly Processing. for the same refer below link.

http://help.sap.com/saphelp_erp60_sp/helpdata/EN/ff/37e247805a11d2b66e0000e82d8bd1/content.htm

http://help.sap.com/saphelp_erp60_sp/helpdata/EN/ab/5d4868733311d2b6600000e82d8bd1/content.htm

Regards,

Sandeep

Former Member
0 Kudos

thanks for valuable your inputs.

as per my client requirement in a Sales Order there may be 3, 4 line items each line item is a BOM ( MRP at Sub Item Level ) how can i map this to PS.

Former Member
0 Kudos

You can do this thru Assembly processing. Pls refer the below link