How do we run the Realignment process for CVC in DP using a flat file. Realignment of single values can be done, but if it is to be done for a number of CVCs through a Excel /Text tab delimited file then how is it to be done. Also when do you use the options of Delete Source in Realignment. What if we want to copy the same Product for a number of different locations.
Thanks,
Harsh
Solution was obtained on my own to resolve the error.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We had same issue, I would like to share the solution, so some one in future can reference.
Step1: Create source file as Tab delimited text file and name it as .xls rather than .txt
Step2: Leave first line blank in the source file.
Step3: When source is created from SAP template, ignore (delete column "Realignment Step", you dont need it, system will generate sequence)
Step4: Leave Step Status Blank, Realignment factor mostly 100 and date in YYYYMMDD format, and Realignment Logic as M.
Step5: Upload the file, It will work.
Hi Harsh,
Realignment can be done for multiple CVCs. Run the T.Code: /sapapo/rlgcopy then select 'Maintain Entries ' from the utilities of the menu bar - select create local file. In the local file you can maintain the entries for the realignment and save the file. Same file can be uploaded by selecting the import local file from the utilities.
Regards,
rajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.