Change price control from 'V' to 'S'

Gurus,

I need to change the price control indicator for a material from 'V' to 'S' to allow cost rollup for this finished part. However I am not able to do so as the field is greyed out in the material master.

Some points that I checked -

1. There are open Prod orders against this item, but none are confirmed

2. There are no movements - i.e. GR/GI etc against the material

3. In OMW1, price control 'S' is maintained against the material type and there is no tick in 'price control mandatory' checkbox

4. The field is not lock relevant.

5. In other plants the price control is already maintained as 'S'.

Am I missing something?

I have gone through lots of threads on this forum, but could not find an answer. Most answers point to standard SAP help documentation. But the problem in this case is that the field is greyed out and does not open up for editing , no matter what I do.

Please help.

regards,

SB