on 05-21-2009 2:18 AM
Hi Gurus,
What will be the procedure after rejecting the usage decision. Stock from quality moves from quality to Blocked. So i tried moving the stock from blocked to quality through the inventory movement transaction, for which it giving an error "Managed by QM view".
So what is the transaction should i use to get the stock back to quality.
What would i recommend to my User if he asked what should i do if the inspection lot is rejected.
Please suggest.
Thanks in advance,
Quantum.
Hi
When you take UD as Rejected against GR from procurement, it is recommended to post stock to return delivery ( Not to Block stock) so that return delivery is created immediately.
If your scenario demands that after rejection you have to post stock to Block stock then inform MM guy to create return delivery from block stock.
Atul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Quantum
please check for the status of the inspection lot. is it CRTD ? Then it is to do with inspection plan availability. If it is REL then check whether the assignment tick and check char are available in the material master
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
What will be the procedure after rejecting the usage decision. Stock from quality moves from quality to Blocked. So i tried moving the stock from blocked to quality through the inventory movement transaction, for which it giving an error "Managed by QM view".
A)When a lot is rejected means you have done RD :122 Mvt.
1.You can do 123 by activating 08 inspection type.
2.Go to MB1B and do 123 Mvt type
3.08 inspection type lot will be generated and Material will appear in quality can be seen thro' QA32.
4.Then UD can be taken.
B)When you move it to Block stock:
1. Then You can activate 08 inspection type.
2.Go to MB1B and do 349 Mvt type.
3.08 inspection type lot will be generated and Material will appear in quality can be seen thro' QA32.
4.Then UD can be taken.
I hope this will help you
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sujit
I followed the way you said.
Now the stock moved to quality and generated a inspection lot, but i cannot record results, as i got an error "no characterisitcs are available for the inspection lot". Did i miss anything there.
Normally we get this error, when there is no inspection plan or the date problem. Here i coudn't find the issue behind the error.
Please suggest.
Thanks,
Quantum.
Hi all
I still have the above problem with the inspection lot generation. Inspection lot is generated with a CRTD status. Inspection plan already exist for this material.
1. Do we need any changes in the configuration to activate the 08 inspection type? I have activated only 01 and 04 in the configuration.
2. Any change required in the master inspection plan?
Please advice.
Thanks,
Quantum.
Hi Quantum,
If inspection lot generated with ref to insp type 08 then create inspection plan with usage "9 - Material check". once you assgn this plan to lot then lot status would be REL and you can do RR & UD.
Make sure in SPRO that for 08 insp type you have maintained usage as 9.
hope this helps.
Thanks!!!
Once QI has done his job and he has already rejected material then why you want to call back same material in QI area again? Why you want to create lot one more time to do inspection?
If you ask me then I suggest two option.
1) If you have rejected material because of poor quality then just return material to vendor with mov type 122 (Return to vendor).
or
2) Scrap it from QI itself with movement type 553 (GI scrapping QI).
hope this helps.
Thanks!!!