cancel
Showing results for 
Search instead for 
Did you mean: 

pcc for discrete orders

Former Member
0 Kudos

Hi, Pls advise the steps required tomaiantain product cost collector in discrete prod orders?

Accepted Solutions (1)

Accepted Solutions (1)

former_member196398
Active Contributor
0 Kudos

Yadav,

1.

First you would need to define an Order type for Product Cost Collectors for Production orders, with category "05". Default for REM is "RM01". CO guys would be using transaction KOT2 to define this.

2.

Now for the Production Order type say for example: PP01, using transaction OPL8 in the controlling tab activate the cost collector check box.

3.

Create the required PP Master data like BOM, Routings and Production version.

4.

Now create the product cost collector using KKF6N or KKF6M(Collective - Deactivate the REM check box and use the order type created in step 1.

5.

Create the prelimenary cost estimate for the product collectors with KKF6N or MF30(Collective).

Regards,

Prasobh

Answers (0)