subsequent adjuestment

Former Member
0 Kudos

what is the fanction of "subsequent adjuestment",and what is the different between the "subcontrcting(MIGO_GS)"and the "subcontrcting(MB04)" under the "subsequent adjuestment"?

thank you !

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

After the subcontractor (as vendor) had delivered the ordered material (end product), you posted the goods receipt to the subcontract order. The system determined the necessary components for each purchase order item and created for each component a goods issue item with the quantity that was determined in the purchase order (see Entering Goods Receipt for the Subcontract Order).

If the vendor informs you after these postings that a greater or smaller quantity of the subcontracting components was actually consumed than planned in the purchase order, you must post a subsequent adjustment to correct the component consumption.

If the component is a by-product, you must post the corrected by-product receipt (excess receipt) or by-product issue (short receipt) (see By-Products in Subcontracting).

Answers (1)

Answers (1)

Former Member
0 Kudos

After the subcontractor (as vendor) had delivered the ordered material (end product), you posted the goods receipt to the subcontract order. The system determined the necessary components for each purchase order item and created for each component a goods issue item with the quantity that was determined in the purchase order (see Entering Goods Receipt for the Subcontract Order).

If the vendor informs you after these postings that a greater or smaller quantity of the subcontracting components was actually consumed than planned in the purchase order, you must post a subsequent adjustment to correct the component consumption.

If the component is a by-product, you must post the corrected by-product receipt (excess receipt) or by-product issue (short receipt) (see By-Products in Subcontracting).

There are no diff between subcontrcting(MIGO_GS)"and the "subcontrcting(MB04)"

the MIGO_GS is enjoy transaction (new) and the MB04 is Old transaciton (traditional)

Former Member
0 Kudos

But can ventor post a greater quantity than I purchased ?Why the ventor post a greater quantity?

Former Member
0 Kudos

And how can I receive the informations about the quantity differences posted from the ventor?

thank you very much!

Former Member
0 Kudos

In the business point of view, most of the company will not give extra quantity of components to the subcontractors to produce the Finished Goods. That is why this feature of Subsequent Adjustment in MIGO is hardly used in CHINA.