Dear Friends,
we have a critical issue regarding the installation of PC 2.5
The customer wants to install the PC 2.5 on the same server as ECC
We know this is according to SAP guidance but we need to elaborate more on the implications.
can any one share his experience on that issue ?
Thanks
Yudit
Hi Yudit
The recomendation from SAP is not to install PC 2.5 in a ECC server.
The prime reason is PC 2.5 has got its own HR org structure .There is a chance that PC 2.5's HR org structure could have conflict with the ECC server's HR org structure,if PC 2.5 is installed on top of a ERP server.
Thanks
Debraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yudit:
I've heard several times directly from several different people at SAP that you should not do this. Even if you could, PC 2.5 runs on NetWeaver 2004s (Netweaver 7.0) and NOT ECC*. That is probably the reason you can give to your client. If you need something more definitive, I would search and find a reference to the same in either the Master, Ops or Installation guides.
Matt
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.