Determine backend

We have the following scenario

One EBP system connected to 2 separate ECC systems .

Material grps ( product cat) are same in both ECC system .

We have already successfully operating with the EBP connected to ECC.

We are now wanting to connect the new ECC to existing EBP.

1. We created a new root node for the new connection.

2. We need to find way to have the PR 's posted to correct ECC

3. When trying to create SC , getting errors

' enter co code"

" enter a location "

" define follow on for PR"

ALl config looks ok .checked BBP_LOCMAP, VENMAP .etc.

Where All i need to check . What needs to be done to achieve as per point 2.

Anyone having this scenario, please let me know how you went by ..