cancel
Showing results for 
Search instead for 
Did you mean: 

INSP RREC to be reset.

Former Member
0 Kudos

Hi champions,

I have an issue where the user has attached wrong inspection plant to the inspection lot.

Then released the Physical samples (QPR4)

and confirmed results of 5 MICs out of 19, suddenly realized that inspection plat contains 19 MICs is attached which is wrong and the other Inspection plan which contains 40 MICs is to be used.

So here the need is to re-assign the inspection plan to the lot,

In normal condition we do it like this.

- With draw approval, so the Lot status changes from REL to CRTD

- Then we cancel the Physical samples through QAC3.

But here in this case of the status INSP RREC.

Pls giude how can I revert this status from INSP RREC to CRTD.

Thanks in advance

- Jimmy

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Hello

once the result recording is done it is not possible to bring the lot back to CRTD status. My suggestion would be make the wrong MICs invalid by going to the attribute and add rest of the mic by creating additional characteristic in the RR screen

Regards

Gajesh

Former Member
0 Kudos

Sir,

I agreed to your suggestion and due respect also. But the problem is the unplanned will not reflected in the COA.

- Jimmy

Answers (2)

Answers (2)

Former Member
0 Kudos

The Question is not answered but I need to proceed this way to close this one, Because I am in need to post new Question.

former_member186399
Active Contributor
0 Kudos

Hello

Then the solution is cancel the GR and do the GR again

Regards

Gajesh

Former Member
0 Kudos

Dear Gajesh,

Thanks once again for the reply.

But the issue to cancel the GR is, this is the Auto GR against the Process Order. So I can't do it. System is not allowing me.

- Jimmy

Former Member
0 Kudos

Hi

Try to cancel the production order confirmation and confirm it once again.

Former Member
0 Kudos

Dear Sir,

You are correct, but unfortunately I have tried that(CORS) also and field.

Kindly get me out of it, pls

- Jimmy

Former Member
0 Kudos

Hi Jimmy,

What I can understand from your thread is,,,,

Your lot is having status INSP RREC

It means, some of the results are confirmed for the lot you are concerned about, correct?

Now you need to revert the lot status from INSP RREC to CRTD, just to rectify the assigned inspection plant to the lot, correct?

If this is the case then Gajesh has truly suggested you to have Unplanned MICs, instead of trying something else.

Regards,

Shyamal