All Gurus:
I am trying to create a route for a specific shipping point (one plant) where the loading time is different for every route. I am looking at configuration for defining shipping point:
IMG > Enterprise Structure > Definition > Logistics Execution > Define, copy, delete, check shipping point. Under "Determine Times", there is "Determine load. times" and 4 options:
No loading time determination
A Route dependent
B Route independent (Route ' ')
C Default from shipping point
If select "C" and specify 11 days for "Loading Time with Days", the system will always have 11 days defaulting on the sales order schedule lines between the "Loading Date" and the "Goods Issue Date".
What I need is to have more flexibility as to the number of days on the Loading time. If I select A or B, can you please let me know what that would do and where I can configure it so that the system gives me more flexibility as to the number of Loading Days?
Thanks in advance,
Ta
Hello
I your case "A"- Route dependent is the standard option for you. In this case it will calculate transit time + Trans Lead Time (Pick/pack) time from every route for a single ship point. Only thin g is you need to maintain transit time and tranportation lead time in the definition of route.
Hope this answers you.
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Tal -
When the loading date and GI date is same you can change the GI date by adding number of days in the field "TransLdTm". This time will get calulated as loading time. In each route definition this may vary according to requirement. this will give you different transit time determination for single ship point.
In configuration do setting as below e.g.
TransitTime 10
Trav.dur.
TransLdTm. 1
TrLeadTimeHrs
With this system will calculate in reverse way from delivery date to customer based on route transit time.
Material availability date + loading time (1) + transit time (10) ... this will be the calculation.
Hope this answers your question. Let me know anything else you require on this.
Regards
Amol
Hi,
is there anything in 'vanilla' ERP (or better CRM), which is doing this calculation? I need that date for validation, but I am not a expert in logistics and I do not know in which transaction such a logic is performed. I would be hightly interested if there is any function module around, which I can just call to give me the date or just the "lead-time" for a single product?
Regards,
Andreas
Edited by: Andreas (Ecomize) on Jul 3, 2009 7:38 AM
Andreas,
You are always better off posting new questions in a new post. Some of the Forum members will not respond to a post when the status of the post is already set to 'answered' and points have been awarded.
Anyhow, I am not sure what you are trying to validate, but during Sales order entry, ERP performs an availability check. It then produces a proposal. In this proposal, all dates have been calculated and are available for inspection: Proposed delivery date, goods issue date, loading date, transportation planning date, and material availability date. You can see these prior to accepting the proposals during the ATP check. No special function module is needed.
Standard Availability check simulation in ERP is transaction CO09. This will display the material availability date. This is the basis of lead time calculations. I am not aware of a transaction in ERP that will also perform a simulation of delivery scheduling and shipment scheduling, other than the standard ATP check done in the sales order (VA01/VA02).
Regards,
DB49
Thanks for the information. It was very helpful.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
9 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.