Route and Loading Time

Former Member
0 Kudos

All Gurus:

I am trying to create a route for a specific shipping point (one plant) where the loading time is different for every route. I am looking at configuration for defining shipping point:

IMG > Enterprise Structure > Definition > Logistics Execution > Define, copy, delete, check shipping point. Under "Determine Times", there is "Determine load. times" and 4 options:

No loading time determination

A Route dependent

B Route independent (Route ' ')

C Default from shipping point

If select "C" and specify 11 days for "Loading Time with Days", the system will always have 11 days defaulting on the sales order schedule lines between the "Loading Date" and the "Goods Issue Date".

What I need is to have more flexibility as to the number of days on the Loading time. If I select A or B, can you please let me know what that would do and where I can configure it so that the system gives me more flexibility as to the number of Loading Days?

Thanks in advance,

Ta

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Ta,

The loading point is influenced by a few criteria for the options A and B as mentioned below.

A - Route-dependent

A route-dependent loading time is determined.

Influencing factors are the shipping point, the route, and the loading group

B - Route-independent

A route-independent loading time is determined.

Influencing factors are the shipping point and the loading group of the material.