on 05-12-2009 2:02 PM
Hi All,
This is a scenario where in i have created a component reservation to network and now instead of creating a planned order and production order i want to consume the material ( assuming i have stock for the material).
When i try to perform GI to network through MIGO or MB1a i get an error saying there is no selectable items in the document(reservation).
Can anyone throw some light on this
Thanks
SAM
Hello SAM,
I having a similar issue, would you share how you resolved it? I am having this problem for a specific material type, not all. Other material types are being issued via network reservation properly.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Closed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
u cant issue materials gainst a reservation that created as "reservation for network"?? is it your issue??
explain more what u r trying to do.. is it through PS or PM??
reg,
sam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In MIGO, using others option, you have to manually enter the Material/Quantity and other details and post Goods Issue. Inventory/Stock is converted to consumption, if the stock exists.
KAP
Edited by: Projectman on May 13, 2009 6:52 PM
Edited by: Projectman on May 13, 2009 6:53 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.