BOM in SD

Former Member
0 Kudos

Hi,

I have created a BOM (Plant X) of 2 components.

The first component is produced in Plant X but the second component is produced in Plant Y.

Ths systeme check availability only in the Plant X. For the second, the system check in the plant X and propose to check in others plants (Y).

The second component exist only in Plant Y. it's possible to check availability for this components directly in the Plant Y.

Thanks for your answer.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

OBK BAC ,

Availability check takes place at plant level. Either it will check at "X" or Plant "Y" not in both. Might be you can extend the material of plant Y to Plant X.

Regards

Sathya

Former Member
0 Kudos

Hello,

Have you checked the availability of mat Y in plant Y i.e. sales view activate availability check.

Thanks

RK

Former Member
0 Kudos

It's ok..

csaba_szommer
Active Contributor
0 Kudos

Hi,

Planning (MRP) and availability check takes place at plant level, so I think you have "no hope" to consider two plants at the same time (in standard system)...

ComponentY should be checked in plantY as per SAP ECC logic.

I'm not very familiar with APO, but it is designed to consider the whole supply chain during planning - so, maybe you can realize it your idea using this SAP solution.

Regards,

Csaba