cancel
Showing results for 
Search instead for 
Did you mean: 

Incorrect Storage Location Detemined in Production Order

Former Member
0 Kudos

Hi There,

When convert planned order to Production order, storage location is determined for component material.

Till 4.7 system, we see that the system was following below sequence for determination storage location:

1) Storage location set into BOM item

2) Storage location determined by WC.

3) Storage location set into material master.

However, in the upgraded ERP 6.0 system we see that the above sequence is not followed any more.

1) Storage location determined by WC.

2) Storage location set into material master.

3) Storage location set into BOM item

Is our understanding correct? How can be bring back the old sequence?

Thanks in advance for your support.

Kind Regards,

Prakash

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi

just check in mrp-2 view of material master

in backflush, it may be set as 2 instead of 1.

just check and come back

regards

Anish

Former Member
0 Kudos

Hi Anish,

In both systems it is 2. (SAP 4.7 and ERP 6.0)

Thanks and Regards,

Prakash

Former Member
0 Kudos

Dear Parkash

If you will set this as 1, then it will start considering the BOM item storage location first.

regards

Anish

Former Member
0 Kudos

Hi Anish,

The issue is that in earlier system it was '2' as well, still the storage location was taken from BOM.

But, in ERP 6.0 it is not taken from BOM.

We do not want to change the master data for this purpose, but need a reason why SAP has changed this behaviour?

Regards,

Prakash

Edited by: Prakash Ayer on May 11, 2009 5:01 PM