hi all,

while creating subcon po system is showing error as not possible to determine componants, though bom has been created for the material.

pl suggest where is the problem?

Regards,

Dipak

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

In CS02 check the BOM validity.

And also check the BOM usage ( CS01 which usagae u assigned)

Then maintain the item category as L in ME21N.

Then check it in the material Tab - Explode Bom.

It will work

Regards,

Raman

Former Member
0 Kudos

Hi

Thanks

Regards,

Dipak

Former Member
0 Kudos

Hello Dipak,

Make sure that ur using Item Category L in PO and also enetering the BOM material ,which is relaesed on a particular date.

Above two points make sure you dont get the issue