cancel
Showing results for 
Search instead for 
Did you mean: 

Dynamic Modification rule and sampling scheme

former_member225637
Active Participant
0 Kudos

Dear Friends,

I am Exporing on dynamic modifcation rule to use in pilot project

What i understand about these two topics are

Sampling scheme

System used to calculate sample acording to sample size we define on the basis of lot size

and we need to define , Normal , tighten,

Dynamic modification rule

normally we need to define in what situation to select Normal and tighten sample

for example if a vendor material inspection lot fails then we need to choose tighten sample

and if it pass then during next inspection lot system must skip or loosen the sample size

Please let me know if my understanding is correct and tell me if there is any additional usage of this functionlity

To make usage of dynamic modification rule i need to create a DMR and sampling scheme and i need to assgin in inspection plan

is it the right way of configuring , Please advice in right way

Thanks & Regards

Raj

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member225637
Active Participant
0 Kudos

closed

Former Member
0 Kudos

Hi Rajkumar,

You are absolutely on the right track.

Please refer following [PDF|http://help.sap.com/printdocu/core/Print46c/en/data/pdf/QMQCDYN/QMQCDYN.pdf] for DMR.

For more inputs you may also refer this [link|http://help.sap.com/saphelp_45b/helpdata/EN/2d/350d37448c11d189420000e829fbbd/frameset.htm].

You may get started with these information and you can always depend on our SAP Champs for fine tuning it.

Thanks,

RAVI.

former_member587434
Active Contributor
0 Kudos

Hi ,

Basically DMR we used for determine the sample size for an inspection in the SAP system in different ways on the basis of the past inspection valuations to calculate the current inspection scope.

On the basis of this you can skip the inspection if you are continuosly getting a good quality product from your vendor & may tighten if the goods quality is low.For using DMR you have to create first the DMR rule thru T code QDR1 & have to assign different inspection stages,here you define how inspection scope change with past inspection results.

DMR you can assign directly in material master quality view , in quality plan, per characteristic as required by you.

For more details go the link below:

[DMR|http://help.sap.com/saphelp_erp60_sp/helpdata/en/26/b9ba34e465b73ee10000009b38f83b/frameset.htm]

I hope it would help you.

Thanks!!!