on 05-08-2009 8:14 PM
Gurus,
I created a process chain for master data text with 'Always' as link between the processes. Couple of 'processes' do not have data in the source system and hence ending up as warning(yellow) in the monitor, with return code 8. As a result, the next process connected to this process is running at all.
My point is since I used 'always' as connector between processes, the next process should be triggered. I manually changed status to 'green' and then the next process ran. Please give me your experiences and alternatives.
Thanks in anticipation
Hi ,
yellow means that the process is still active (loading is going on) . you can check in the source system for this .or it can be a problem with the idocs either in the BW or R3 not getting processed . you can either Check the details tab or step by step analysis in the monitor to find where exactly the problem lies .
Regards,
Biyaz
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Biyaz,
Yes it is idocs issue. Any ideas to resolve. The message in the status tab of monitor is:
No data available
Diagnosis
The data request was a full update.
In this case, the corresponding table in the source system does not
contain any data.
System Response
Info IDoc received with status 8.
Procedure
Check the data basis in the source system.
And the message in Details tab is
No data available, data selection ended
Thanks in advance.
Info IDoc received with status 8. means no data available in ECC/R3... It is not loading issue.. Check the corresponding ECC/R3 table why data is not available.
Agreed. Still curious to know is
1)when the number of records are '0', an infopackage returns green. But in process chains why it does not turn green?
This is true, only if u have following setting
Double click ur infopackage .. follow menu
Schedular -> Traffic Light color for empty request -> select either green or red (usually red)
+2) what are the options to make sure the other processes run? +
What we r doing is for every datasource we created TWO infopackages one for manual load and other for (to include in) process chains. we did above setting for PC infopackage so that PC should continue to finish when the process type is connected with 'Always'
My point is since I used 'always' as connector between processes
Here 'Always' means either RED or GREEN, not YELLOW (status 😎
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
76 | |
9 | |
8 | |
7 | |
6 | |
5 | |
5 | |
5 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.