activity type int processing activity

Former Member
0 Kudos

Dear All

I have creat activity type & assign this activity type to work center in "ActTypeProc." IN KP26 , i maintain activity price & all other things but when i maintain this activity type & work center in WBS for respective internal activity system not shown me plan cost as well as when i confirm the activity system not shown me actual cost also. Pl gave some input on this

Regards

Accepted Solutions (1)

Accepted Solutions (1)

former_member711289
Participant
0 Kudos

Hi nivruti,

check ur work center whether u have put formula sap008 in other formula in capacity tab page. in schedulling tab page formula sap004 . check whether in costing tab page ur entries are correct regarding activity type and cost center.

In activity type put * in cctr catagory , activity type catagory 1, give secondary cost element (this can b a reason of ur problem) in allocation cost element.

Apart from this also check costing variant whether actual and planned has been maintained properly or not.

Regards

Abhishek Sinha

Idhasoft, India

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Please check in OPSU whether you have ticked the Cost checkbox for Control Key PS01.

Muzamil

Former Member
0 Kudos

Dear Muzamil

In OPSU their was ticked for Cost checkbox for Control Key PS01.

Regards

former_member203108
Active Contributor
0 Kudos

Chk whether costing variant for plan and actual are assigned to network profile...

Former Member
0 Kudos

adding to the above, check whether the formula SAP008 is entered in costing tab of work center or not.

ashis