While confirming an order thru t/c co15, in the Gooda movement tab, GI by mmt type 261 is acceptable.

while GR through mmt type is 101 is not accepting.

why is it so?

Best regards,



Hi Kumar,

For FERT GR, we have two cases.

1. With Manual GR, During confirmation we can't do GR (101 Mvmt) for Finish product. We have to do it in separate transaction either with MB31 or MIGO.

2. If you want to do it automatically, the either set control key with auto GR in last opeation or configure in scheduling profile and assign to material master. Then when u confirm last operation, automatically GR happens for FERT.


0 View this answer in context