Dear Friends,

I want to have inspection lot for calibration of Lab equipment

what i understand is

Creating the Maintenance Plan

Assigning and Displaying the Task List

Scheduling the Maintenance Plan

Displaying the Calibration Order and Inspection Lot

Entering Characteristic Values

Entering the Usage Decision

but just want to know what are the basic setting to activate inspection type 14 , do i need to treat Equipment as material master or is there any place to activate inspection type 14 in Equipment

Thanks & Regards

Raj

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Ram

The 14 inspection type is to be activated in the config

1) SPRO>QM>Quality inspection> inspection lot creation> inspection in plant maintenace> maintain 14 against the order type you are going to use. Normaly PM05 is used.

Things to be noted

1) Inspection lot is created when order is released and saved

2) in task list you have to have a sampling procedure which has a tick in plant maintenance ( QDV1)

Check and revert back

Regards

gajesh

Former Member
0 Kudos

Thank you Rajiv

But how do i check for the inspection lot no. the calibration order?

Former Member
0 Kudos

Dear

There is a button of Mgnifying glass like in order nearer to Order description

Regards

Raj