on 05-05-2009 4:53 PM
Hello All
I have set up two batch jobs using variants for Auto UD for inspection type 01(Qa17)and 03(QA41).
QA41 seems working fine it does UD for most of the skipped lots.
For inspection type 01 , it does UD for some skipped lots but not for all. The expection is it should do UD for all skipped lots.
I noticed it does not do auto UD for lots with status QLCH (Skipped lots).
When I do QA16 it work fine and does UD for all lots.
Is there something to be set up differently in the variant ?
Pls advise.
Hi Gaurav
Status QLCH indicates that Quality level is changed does not have any impact on Auto UD. Either while execution if some one is working on same material (Locked by other user) then system will not consider to complete UD.
Please shedule auto UD job in background mode after 01.00 hrs (Night) to eliminate doubt I raised.
Kindly revert back
Atul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thx
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
check one of the following possibility
1.In materila Master check Automatic UD is Ticked.
2.You have used sampling procedure with no stage change
3.Class of char is such that skip is not allowed.
or
in QA17
You have not ticked on Long Term char.
In order to check this make exact copy of QA16 and check
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Gourav
Just checking
Have you maintained Automatic Usage Decision for Skipped Inspection Lots in QA17
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.