on 05-05-2009 4:36 AM
Hi,
We are using EBP 4.0 and SRM 3.0 with extended classic scenario.
The PO is being transferred to the back end, and the confirmation is also tranferred to the back end which means the RFC connection is fine.
The problem is While I want to view or edit the PO through link in SRM front end
Professional Purchaser ->Purchase orders-> Purchaser Cockpit it takes a very long while in "Application being loaded" status before throwing up the error -- "R/3 System didnot respond (timeout)" -- The R/3 system didnot respond. Time out occured. Session Terminated.
your inputs are highly appreciated.
reagards,
MRao
done
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Mahesh,
Have a look at the following OSS Note:
Note 727510 - ITS System Info, R/3 System did not respond
Thanks,
Pradeep
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.